WORKS – WAREHOUSING – FACTORY – CONTROL FACTORY OR NEED TO CHECK THE QUALITY OF WORKS?
A) When it is detected that the quality of the works is damaged by some parts of the construction, there are signs of danger, it is not safe for exploitation and use. (especially Garment and Textile Factory – Processing factory – Shoe factory – Aquatic factory – Other works ….)
B) When there is a program (Audit) to assess factory capacity, building and factory safety (Factory Capability and Capacity Audit) eligible to join the regional supply chain.
C) When the factory is old, there are no construction technical documents, it is necessary to check the quality of the works, factories, factories.
D) When there is a request to assess the current quality of the works to serve the maintenance process for buildings that have been put into use but no maintenance procedures are available..
E) When it is necessary to have a basis to decide on the extension of the useful life of the works for the works that have reached the end of their design life or as a basis for the renovation and upgrading of the works..
COMPANY HAS CAPACITY IN QUALITY INSPECTION OF WORKS?
Vietsum Construction Consultancy and Quality Control Joint Stock Company (VCQC) Recognized by the Business Registration Certificate No. 0316425344 issued by the Department of Planning and Investment of Ho Chi Minh City. Activities in the field of consulting solution design, construction quality inspection, consultancy and maintenance works, the works to introduce the product to the factory.
Hotline: 096 613 9597 (Mr Hùng) – 090 959 8771 (Mr Nam)
Web: kiemdinhnhaxuong.vn
Mail: vietsum@vietsum.vn
………………………………
PROCEDURES AND COST OF INSPECTION OF WORKS – FACTORY – FACTORY IN VIETSUM (VCQC)
A) Survey the current status of the inspected object;
B) Proposal preparation, outline verification and audit estimate;
C) Collect and study documents related to the audit;
D) Experiment, calculate, analyze, observe and evaluate;
E) Shipping costs for inspection;
F) Prepare test results report; assess the quality of the works for the issuance of certificates of load-bearing safety and establish the maintenance procedures for the works, factories, warehouses, garment factories, shoe factories, and packaging factories;
G) Make estimates according to regulations for maintenance and reinforcement of works (if any);
/………………………………………………………………………./
WORKS: FACTORY – HIGHWAY 60, TAN THANH BINH, MO CAI BAC, BEN TRE PROVINCE
ACTIVITIES: MANUFACTURING TRADE IMPORTING FURNITURE – FURNITURE.
TEST ITEMS: 22.500 M²
Photo: Overview photo of the inside of the building
Photo: Overview photo of the inside of the building
Photo: Overview photo of the inside of the building
Photo: Overview photo of the inside of the building
Photo: Overview photo of the inside of the building
Photo: Check the steel column size
Photo: Check the size of the steel truss frame
Photo: Check the box iron thickness of the steel truss frame
Photo: Check strength and stiffness of steel columns
Photo: Check the size of the bolt connecting the steel column foot
Photo: Test the strength and stiffness of the column neck concrete
/……………………………………………………………../
Hotline: 090 959 8771 – Mr Nam