Factory inspection for intensity floors, the floor load test, roof load test

Quality inspection of increasing the load of the foundation, floor, roof: in order to serve the development and expansion of the factory, maintenance of the building, determining the quality of the foundation, floor, roof, assessing the condition of the structure of the building, the workshop, to have an optimal plan for installing more loads in the future, such as installing more machine shifts, converting usage functions, installing more solar batteries, solar panels on the roof (rooftop).

Vietsum factory inspection will describe the purposes of testing the foundation, floor and roof for additional loads:

PURPOSE OF INSTALLATION OF MORE WEIGHT FACTORY – WORKS:

1. Quality inspection of the current state, calculation and determination of the load-carrying capacity of the workshop floor to serve the installation of more shelves, installation of more machines and vehicles to operate goods….;

2. Check the quality of the current status of the floor, calculate and determine the load-carrying capacity of the workshop floor for machine layout, machine load, and increased live load….;

3. Quality inspection of the current state of the roof structure, roof purlins, calculation and determination of the load capacity of the roof of the workshop for the installation of solar batteries, roof water tanks, heaters, Factory air conditioning heating system…;

Factory inspection for intensity floors, the floor load test, roof load test

Photo: check size, thickness of components, roof purlins of workshops.

Factory inspection for intensity floors, the floor load test, roof load test

Photo: check size, thickness of components, roof purlins of workshops.

Factory inspection for intensity floors, the floor load test, roof load test

Photo: check the size and thickness of the hanging frame to serve the calculation of bearing safety.

Factory inspection for intensity floors, the floor load test, roof load test

Photo: Check the size and thickness of the hanging frame for load-bearing safety calculations.

Factory inspection for intensity floors, the floor load test, roof load test

Photo: installing solar panels -solar- on the roof of the factory.

CONTENTS OF THE FACTORY INSPECTION – INSPECTION OF INSTALLATION LOADING SOLAR BATTERY ON THE ROOFTOP:

1. Visually check the current status at the factory:

   – Check and determine the defects, damage to the surface of the work, the locations of cracks.

   – Measure and draw typical structure of works (Measurement of thickness, size of components)

   – Record and take pictures of defective and damaged locations.

   – Data acquisition machine: Steel ruler, laser distance meter, crack width meter.

2. Check the structure of the floor, factory floor:

   – Check, determine the characteristics, thickness of the structure layers of the foundation, floor (concrete, crushed stone).

   – Data collection machine: Concrete drill, hand drill, steel ruler, caliper.

3. Concrete strength test:

   – Data collection machine: Sampling drill – Concrete drill, hand drill.

4. Check the factory floor, floor, roof deflection:

   – Check the deflection (difference of points) of the existing building foundation nền.

   – Data collection machine: Surveying – Electronic total station leica.

FINISHING RESULTS OF FACTORY QUALITY ASSESSMENT – GARMENT FACTORY INSPECTION

A. Calculation and determination of the load-bearing capacity of the foundation, floor, roof: Based on the survey results of the actual status, combined with the as-built records of the work, geological survey records of the work area or its vicinity.

B. Determine the actual condition of the factory floor, floor, roof.

C. Bearing capacity of the floor, floor, and roof of the factory when installing additional loads, evaluating the whole factory for normal use.

D. Reinforcing treatment plan for the floor, floor and roof of the workshop (if any).